+34 942 20 16 16 info.sicma@ihcantabria.com

SICMA

Development of a system for the prevention and response to marine and air pollution by Hazardous Noxious Substances

To achieve the SICMA goals, the project is divided within six workpackages:
  • Workpackage 1: Definition of the final product and basic development
  • Workpackage 2: Laboratory tests to analyse the physicochemical behaviour of pollutants
  • Workpackage 3: Development of algorithms for the operational prediction of HNS spills
  • Workpackage 4: Development of methodological procedures to assess risk and enhance safety
  • Workpackage 5: Development of interfaces
  • Workpackage 6: System validation

LANGUAGES

SICMA

Development of a system for the prevention and response to marine and air pollution by Hazardous Noxious Substances

RTC-2017-6642-2, 2019-2021

A PROJECT IN PARTNERSHIP WITH:

SUPPPORTED BY:

COFINANCED BY: